|
|

| | |  | Classroom and hands-on training of pre-finished hardwoods
Product supplied by several manufacturers
Nail-down, glue-down, floating installations and re-coating are covered
Reference materials for future use are included
Additional Topics
Professionalism - Job site Evaluation (Preparation, Transitions- two parts)
Grades (On, Above, below) - Sub-Floors
Moisture (Effects of Moisture, Moisture testing Procedures)
Acclimation – Estimating - Balancing Floors
Properties & Characteristics - Unfinished & Pre-Finished
Factory Finishes - Nail Down – Staple/ Cleats - Floating Install - Glue Direct Install
Differences of Installation Systems – Transitions
Radiant Systems (Electric, Hydronic, R-Values) - Maintenance
| | Event Details | |  |
| | | | |
Flooring Events
|
|
|